Students first
RADISSON PARK ELEMENTARY SCHOOL
In consultation with the Calgary Board of Education (CBE), RK streamlined the design and development of a new K to 4 facility, adjacent to the existing Sir Wilfrid Laurier Junior High School.
Designed to a capacity of 350 students – while leaving open the future possibility of expansion – Radisson Park School was constructed with students in mind, all while adhering to pre-established cost parameters. Central to the assignment was providing CBE with a price-conscious and budget-friendly means of expanding, maintaining, and upgrading the school’s infrastructure, while simultaneously empowering RK and its partners to manage the project development, design, and construction of this new educational facility.